About the project

Apex provided transport planning and highways advice to support a full planning application for the redevelopment of a long-vacant site at 493–499 Bath Road in Brislington, Bristol.

The proposals, brought forward by Sovereign Network Group (SNG), comprise the demolition of derelict former retail and warehouse buildings and the construction of 90no. affordable residential dwellings (7 houses and 83 apartments) together with associated access, parking, landscaping and boundary works. The scheme will deliver much needed affordable homes in a sustainable location to the southeast of Bristol city centre, with vehicular access provided from Tramway Road.

The site has a notable planning history. An earlier application for 146 homes on the same site was refused in 2021. This new application revisited the site with a scheme specifically designed around affordability and sustainable travel, adopting the same access principles whilst introducing a layout better tailored to the needs of the development and its future residents.

Apex was appointed to lead the transport case from pre-application scoping through to the negotiation and agreement of planning obligations, working closely with the wider project team throughout.

THE CHALLENGE

Additional considerations during the project

The key transport challenges related to:

  • Justifying a low-car parking strategy — 34 spaces for 90 dwellings — significantly below the maximum permitted under Bristol City Council’s parking standards, in a location where the highway authority had concerns about overspill parking on surrounding streets
  • Demonstrating safe and policy-compliant access and internal layout, including swept path compliance for refuse vehicles, passing places, forward visibility splays and pedestrian connectivity in accordance with BCC’s Street Design Matrix
  • Responding comprehensively to BCC’s pre-application highway comments and subsequent rounds of consultation
  • Negotiating a proportionate and robustly evidenced Section 106 package, including challenging elements of BCC’s initial contribution request that were considered disproportionate to the development’s impact
  • Securing planning conditions in a form that would be workable for SNG as the long-term owner and manager of the site
OUR APPROACH

From initial masterplanning input through to planning approval

A comprehensive transport strategy from pre-application scoping to planning obligation agreement

Apex’s involvement began at pre-application stage with the preparation of a Transport Scoping Report, which agreed the assessment methodology and scope with BCC prior to the formal application. This early engagement ensured that the subsequent Transport Assessment addressed BCC’s requirements from the outset and minimised the risk of objection on process grounds.

Sustainable connectivity and low-car justification

The Transport Assessment set out a detailed case for the low-car parking approach, combining a review of the site’s sustainable location with analysis of census car ownership data disaggregated by tenure and dwelling type. The assessment demonstrated that the site benefits from direct pedestrian and cycle access to a wide range of local facilities, services and employment areas, and is well served by frequent bus services on the A4 Bath Road, with Bristol Temple Meads accessible within a 30-minute walk or 7-minute cycle ride. Given that all 90 dwellings are affordable, a tenure typically associated with significantly lower car ownership rates, the evidence supported a provision of 34 spaces, including 9 accessible bays, as appropriate and sufficient to meet demand without generating overspill on surrounding streets.

To address the highway authority’s concern about potential overspill parking, Apex commissioned and analysed on-street parking beat surveys across Tramway Road and the surrounding residential streets. The surveys demonstrated that existing on-street capacity was sufficient to accommodate any additional demand without giving rise to highway safety concerns, providing robust empirical evidence to underpin the low car parking approach.

To further support sustainable travel, 139 cycle parking spaces were provided across the development, above the policy minimum, with secure, sheltered provision for apartments and dedicated cycle stores within the curtilage of each house.

Access design and internal layout

The access junction on Tramway Road was designed to accommodate all vehicles expected to use the site, including large refuse vehicles, and was tested through swept path analysis. The internal street layout was designed in accordance with BCC’s Street Design Matrix, with carriageway widths, shared surfaces and an indicative pedestrian zone at the Tramway Road access point working together to keep vehicle speeds to 15mph or below. These arrangements were iteratively refined in response to BCC’s comments and were ultimately confirmed as acceptable by the highway authority.

Stakeholder engagement and negotiation of planning obligations

Apex engaged extensively with BCC Transport Development Management throughout the application process, responding to detailed consultation comments and participating in a meeting in November 2025 to resolve outstanding matters. BCC’s final consultation response recommended approval, subject to Section 106 contributions.

BCC initially sought Section 106 contributions towards improvements to the Arnos Court B bus stop. Apex robustly challenged this request, demonstrating that the proposed contribution did not meet the three statutory planning tests. It was not necessary to make the development acceptable, was not directly related to the development, and was not fairly and reasonably related in scale and kind to its impacts. Apex further evidenced that the improvements sought were already identified for delivery through the West of England Mayoral Combined Authority’s City Region Sustainable Transport Settlement, meaning a separate developer contribution would result in a double funding of works that were not required as a consequence of this scheme. Following negotiation, BCC accepted this position and the overall Section 106 package was agreed in a proportionate form, covering travel plan monitoring and a Traffic Regulation Order to support a car club space.

A Travel Plan was also prepared as part of the application, setting out practical measures to promote walking, cycling and public transport use and minimise reliance on the private car among future residents.

THE OUTCOME

Full planning consent granted

Full planning permission was granted by Bristol City Council on 27 April 2026, confirming that the proposals are acceptable in transport and highway terms.

The approved scheme will deliver 90no. affordable homes on a brownfield site in a sustainable location, supported by a well-considered transport strategy that prioritises active travel and public transport, provides appropriate parking for a low-car development, and secures a proportionate package of planning obligations negotiated to reflect the true impact of the scheme.

Related projects

Get in touch

Contact us

    Please complete the form below with your details and project information, and a member of our team will respond as soon as possible.

    We aim to reply within one working day. We will only use your information to respond to your enquiry. Read our Privacy Policy for more.